Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1019426.015
Citation: 01018A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 07/20/2015
Nr Instances: 4
Nr Exposed: 3
Abatement Date: 08/13/2015
Gravity: 10
Report ID: 0830100
Contest Date:
Final Order: 08/11/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/11/2015 | $2,800.00 | 08/13/2015 | Serious | |
Penalty | Z: Issued | 07/20/2015 | $2,800.00 | 08/13/2015 | Serious |
Text For Citation: 01 Item/Group: 018A Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) East Wall; On or about January 22, 2015 and at times prior, employees were exposed to shock and fire hazards from utilizing a flexible cord to power a panel saw located in the main manufacturing area on the eastern wall. b) Cabinet Shop; On or about January 22, 2015 and at times prior, employees were exposed to fire hazards from utilizing temporary power to provide a permanent power supply to equipment such as, but not limited to the spot light. c) Cabinet Shop; On or about January 22, 2015 and at times prior, employees were exposed to fire hazards from utilizing temporary power to provide a permanent power supply to equipment such as, but not limited to a relocatable power. d) Cabinet Shop; On or about January 22, 2015 and at times prior, employees were exposed to fire hazards from utilizing temporary power to provide a permanent power supply to equipment such as, but not limited to the building exhaust fan.