Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.

Inspection Nr: 757902.015

Citation: 01018

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $5,390.00

Current Penalty: $2,488.00

Issuance Date: 05/08/2013

Nr Instances: 2

Nr Exposed: 15

Abatement Date: 03/27/2015

Gravity: 10

Report ID: 0213100

Contest Date: 05/31/2013

Final Order: 02/27/2015

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 02/27/2015 $2,488.00 03/27/2015 Serious  
Penalty C: Contested 06/03/2013 $5,390.00 05/30/2013 Serious  
Penalty Z: Issued 05/08/2013 $5,390.00 05/30/2013 Serious  

Text For Citation: 01 Item/Group: 018 Hazard:

29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a) Bagger Room - On or about January 10, 2013, a Premier Tech Panel box (Serial # 1EM0011) for Bagger #1 containing 600V and 3 phase power had a missing knockout on the bottom. b) Bagger Room - On or about January 10, 2013, a Premier Tech Panel box (Serial # 1EM0012) for Bagger #2 containing 600V and 3 phase power had a missing knockout on the bottom.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.