Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1280876.015
Citation: 01018
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $6,097.00
Current Penalty: $3,737.80
Issuance Date: 05/03/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/30/2018
Gravity: 1
Report ID: 0418100
Contest Date: 05/14/2018
Final Order: 05/17/2019
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/17/2019 | $3,737.80 | 05/30/2018 | Serious | |
Penalty | C: Contested | 05/23/2018 | $6,097.00 | 05/30/2018 | Serious | |
Penalty | Z: Issued | 05/03/2018 | $6,097.00 | 05/30/2018 | Serious |
Text For Citation: 01 Item/Group: 018 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: Inside the building: On or about November 7, 2017, and at times prior to employees were engaged in work activities including but not limited maintenance and operation of machines receiving power from a panel box controlling equipment such as but not limited to the Super Sack, Shop, Line #1, and Line #5 outlets. The panel box had some breakers labeled, but other breakers were not labeled or the handwriting was illegible.