Violation Detail
Standard Cited: 19100119 J04 II Process safety management of highly hazardous chemicals.
Inspection Nr: 313137804
Citation: 01017C
Citation Type: Serious
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty:
Issuance Date: 09/14/2011
Nr Instances: 1
Nr Exposed: 500
Abatement Date: 09/27/2011
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/28/2011 | 09/27/2011 | Serious | ||
| Penalty | Z: Issued | 09/14/2011 | $7,000.00 | 09/27/2011 | Serious |
Text For Citation: 01 Item/Group: 017C Hazard: CHEMNEP
29 CFR 1910.119(j)(5): The employer did not correct deficiencies in equipment that were outside acceptable limits (as defined by process information in 29 CFR 1910.119(d) before further use or in a safe and timely manner: The employer did not correct deficiencies in the ammonia refrigeration equipment that were outside acceptable limits before further use or in a safe and timely manner. a) Rusted, pitted and corroded piping were in use in various areas including, but not limited to, Loop A Chiller, Loop B Chiller, Loop C Chiller, oil knock out pots for Vilter compressors, liquid ammonia line to the Keg Room. b) Pressure relief valves were not replaced at least every 5 years in various areas, including but not limited to, Beer Cooler 7 oil pot, Loop B Chiller oil pot, Loop C Chiller oil pot, Cooler 6 oil pot. ABATEMENT DOCUMENTATION REQUIRED PER 29 CFR 1903.19(d)ION
Translate