Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 315121848
Citation: 01017
Citation Type: Other
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty: $4,187.50
Issuance Date: 12/06/2011
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/01/2013
Gravity: 10
Report ID: 0523400
Contest Date: 12/23/2011
Final Order: 03/01/2013
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/01/2013 | $4,187.50 | 06/01/2013 | Other | |
| Penalty | Z: Issued | 12/06/2011 | $7,000.00 | 01/20/2012 | Serious |
Text For Citation: 01 Item/Group: 017 Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: (a) A written procedure outlining the inspection requirements of piping was not developed. (b) A written procedure outlining inspection requirements of pumps was not developed. Certification, and documentation/evidence of abatement is required. Certification of abatement is required by 29 CFR Part 1903 and is to be submitted within ten (10) calendar days after the abatement date.ment