Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1152337.015
Citation: 01016E
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,988.00
Current Penalty: $0.00
Issuance Date: 11/28/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/15/2017
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 12/16/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/16/2016 | $0.00 | 01/15/2017 | Serious | |
Penalty | Z: Issued | 11/28/2016 | $4,988.00 | 12/22/2016 | Serious |
Text For Citation: 01 Item/Group: 016E Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables where used were attached to building surfaces: The employer did not ensure flexible electrical cords in the main plant along the west wall were not attached to the wall and exposed employees to electrical shock hazards.