Violation Detail
Standard Cited: 19100305 B02 Wiring methods, components, and equipment for general use.
Inspection Nr: 992612.015
Citation: 01016A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,300.00
Current Penalty: $5,355.00
Issuance Date: 02/12/2015
Nr Instances: 4
Nr Exposed: 25
Abatement Date:
Gravity: 10
Report ID: 0636900
Contest Date: 03/16/2015
Final Order: 12/07/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/07/2015 | $5,355.00 | Serious | ||
| Penalty | C: Contested | 06/01/2015 | $6,300.00 | Serious | ||
| Penalty | Z: Issued | 02/12/2015 | $6,300.00 | Serious |
Text For Citation: 01 Item/Group: 016A Hazard:
29 CFR 1910.305(b)(2): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose. On or about August 28, 2014, electrical panel boxes including but not limited to the following were not effectively closed, exposing employees to electrical shock hazards. Instance a: In the compressor room, Dryer cover, 230 volt panel cover was missing; Instance b: In the final assembly on column 17, 3 phase 240 volt panel outside cover was missing; Instance c: In the tank shop, 240 volt electrical panel cover was missing; Instance d: In the sheet metal shop, 240 volt electrical panel box the cover was missing.
Translate