Violation Detail
Standard Cited: 19100303 B01 II General.
Inspection Nr: 1400418.015
Citation: 01016A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,304.00
Current Penalty: $2,652.00
Issuance Date: 10/25/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 11/15/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2019 | $2,652.00 | Serious | ||
Penalty | Z: Issued | 10/25/2019 | $5,304.00 | Serious |
Text For Citation: 01 Item/Group: 016A Hazard:
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: On or about May 8, 2019, in B building, the Warner Swasey horizontal lathe had an electrical dual push button control with the outer housing of the control box damaged and open at the top exposing the interior wiring.