Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100269 D08 II C Electric Power Generation, Transmission, and Distribution.

Inspection Nr: 900009.015

Citation: 01016

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $7,000.00

Issuance Date: 09/24/2013

Nr Instances: 1

Nr Exposed: 9

Abatement Date: 10/24/2013

Gravity: 10

Report ID: 0418200

Contest Date: 11/04/2013

Final Order: 12/05/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 12/05/2014 $7,000.00 10/24/2013 Serious  
Penalty C: Contested 12/30/2013 $7,000.00 10/24/2013 Serious  
Penalty Z: Issued 09/24/2013 $7,000.00 10/24/2013 Serious  

Text For Citation: 01 Item/Group: 016 Hazard:

29 CFR 1910.269(d)(8)(ii)(C): When more than one crew, craft, department, or other group is involved, assignment of overall job-associated lockout or tagout control responsibility shall be given to an authorized employee designated to coordinate affected work forces and ensure continuity of protection: a. Unit 2 - The employer did not assign overall responsibility for tag out control to one authorized employee to coordinate the transfer of such responsibilities across shift changes for Unit 2.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close