Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1229034.015
Citation: 01016
Citation Type: Serious
Abatement Date: 09/25/2018 2
Initial Penalty: $7,967.00
Current Penalty: $4,125.00
Issuance Date: 10/31/2017
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date: 11/23/2017
Final Order: 09/04/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/04/2018 | $4,125.00 | 09/25/2018 | Serious | |
Penalty | C: Contested | 12/13/2017 | $7,967.00 | 11/28/2017 | Serious | |
Penalty | Z: Issued | 10/31/2017 | $7,967.00 | 11/28/2017 | Serious |
Text For Citation: 01 Item/Group: 016 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose. On 5/2/17, at the Buford facility, in the Maintenance shop area, employees were exposed to electrical shock hazards as the electrical cord to the Wilton sander was spliced and then the splice wrapped in electrical tape only and did not provide an adequate outer sheath for protection. Equipment is 230 volt.