Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1056557.015
Citation: 01016
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,300.00
Current Penalty: $3,150.00
Issuance Date: 10/09/2015
Nr Instances: 16
Nr Exposed: 16
Abatement Date: 11/14/2015
Gravity: 10
Report ID: 0215800
Contest Date: 10/30/2015
Final Order: 04/04/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/04/2016 | $3,150.00 | 11/14/2015 | Serious | |
| Penalty | C: Contested | 10/30/2015 | $6,300.00 | 11/14/2015 | Serious | |
| Penalty | Z: Issued | 10/09/2015 | $6,300.00 | 11/14/2015 | Serious |
Text For Citation: 01 Item/Group: 016 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Sawmill, Maintenance Shop, on or about 4/14/15: Rotating chuck on a Becker vertical milling machine was not guarded. b) Sawmill, Maintenance Shop, on or about 4/14/15: Rotating chuck on a Delta drill press was not guarded. c) Sawmill, Debarker, on or about 4/14/15: Ingoing nip points on the trough chain conveyor were not adequately guarded and there was an opening above the chain conveyor where moving logs pass through along the conveyor that was not guarded. d) Maintenance Shop, on or about 4/14/15: Rotating chuck on a Dayton drill press, Model 3Z919, was not guarded. e) Boiler Room, on or about 4/14/15: Ingoing nip points on a metering bin auger were not adequately guarded in that the interlock safety switch for cover was not functioning. f) Wood Shop, on or about 4/15/15: Hold downs on a Dodds dovetail machine were not guarded. g) Table Assembly Area, on or about 4/15/15: Unused portion of blade on a Rockwell vertical bandsaw was not adequately guarded. h) Contract Assembly, on or about 4/15/15: Rotating chuck and routing bit on a Delta drill press were not guarded; rotating chuck and hole cutter on a Dayton drill press were not guarded; and rotating chuck on a Delta drill press was not guarded. i) Contract Wood Shop, on or about 4/15/15: Rotating chuck on a Dayton drill press was not guarded. j) Contract Wood Shop, Cellar, on or about 4/15/15: Rotating chuck on a Craftsman drill press was not guarded. k) Finishing, Hand Sand Repair, on or about 4/16/15: Rotating chuck on a Craftsman drill press was not guarded. l) Recycling Area, on or about 4/16/15: Ingoing nip points and pinch points on an EPCO Wastebuster cardboard baler were not guarded in that the safety interlock switch was not working. m) UFB Bldg., Second floor, on or about 4/16/15: Rotating chuck on a Craftsman drill press was not guarded. n) Finishing, Upholstery Sewing Dept., on or about 4/16/15: Point of operation on a Singer sewing machine #831 was not provided with a needle guard. Abatement documentation must be submitted for items a, e, f, g, m.