Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1326471.015
Citation: 01015B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/17/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/14/2019
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/07/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/07/2019 | $0.00 | 03/14/2019 | Serious | |
| Penalty | Z: Issued | 12/17/2018 | $0.00 | 01/14/2019 | Serious |
Text For Citation: 01 Item/Group: 015B Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: a) Line 3: Production department - On or about June 27, 2018 and at times prior to, employees used an extension cord to energize equipment including but not limited to fans and production machines. The cord hangs from the machine structure and strain relief was not provided. The outer insulation was separated from the attachment plug, exposing the insulated conductors inside. b)Line 2: Enercan machine - On or about June 27, 2018 and at times prior to, employees plugged in the 480 V cable that energized the machine. The cord was hanging from the machine structure and strain relief was not provided where the attachment plug was connected to the cord exposing the insulated conductors inside were exposed.