Violation Detail
Standard Cited: 19100305 G02 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1023693.015
Citation: 01015B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/30/2015
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/05/2015
Gravity: 10
Report ID: 0523400
Contest Date: 08/20/2015
Final Order: 01/22/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/22/2016 | $0.00 | 08/05/2015 | Serious | |
Penalty | C: Contested | 08/25/2015 | $0.00 | 08/05/2015 | Serious | |
Penalty | Z: Issued | 07/30/2015 | $0.00 | 08/05/2015 | Serious |
Text For Citation: 01 Item/Group: 015B Hazard:
29 CFR 1910.305(g)(2)(ii): Flexible cords were not used only in continuous lengths without splice or tap: (a) Chrome Recovery Process - Third Process Right Side Acid Tank: On or about February 27th, 2015 flexible electrical cords providing power to the float control level switch were spliced together using wire nut connectors and black electrical tape, exposing employees to an electrical shock hazard.