Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1558914.015
Citation: 01015A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,116.00
Current Penalty: $8,000.00
Issuance Date: 04/14/2022
Nr Instances: 2
Nr Exposed: 40
Abatement Date: 05/03/2022
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 05/04/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/04/2022 | $8,000.00 | 05/03/2022 | Serious | |
Penalty | Z: Issued | 04/14/2022 | $9,116.00 | 05/03/2022 | Serious |
Text For Citation: 01 Item/Group: 015A Hazard:
29 CFR 1910.305(b)(1)(i): Openings through which conductors entered cutout boxes, cabinets, or fittings were not effectively closed: On or about October 28, 2021, the employer did not ensure cutout boxes, cabinets and fittings were closed. This condition exposed employees to 2nd and 3rd degree burns from electrical shock. Roll Mill Area: The cabinet through which the conductors entered below the 480v feed for the north side conveyor and 480v overhead crane main disconnect was not effectively closed.