Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 313357089
Citation: 01015
Citation Type: Serious
Abatement Status: I
Initial Penalty: $5,000.00
Current Penalty: $4,000.00
Issuance Date: 03/28/2011
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 03/31/2011
Gravity: 05
Report ID: 1032500
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/14/2011 | $4,000.00 | 03/31/2011 | Serious | |
| Penalty | Z: Issued | 03/28/2011 | $5,000.00 | 03/31/2011 | Serious |
Text For Citation: 01 Item/Group: 015 Hazard: CHEMNEP
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective. a)Engine room: On or about October 4, 2010 and at times prior thereto, a 4.5 Kilovolt panel was not properly grounded. The grounding cable was attached to an out of service water line that had been disconnected at both ends. Note: Abatement certification is required for this item.