Violation Detail
Standard Cited: 19100147 F04 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1560050.015
Citation: 01015
Citation Type: Serious
Abatement Status:
Initial Penalty: $10,151.00
Current Penalty: $10,151.00
Issuance Date: 04/25/2022
Nr Instances: 4
Nr Exposed: 12
Abatement Date: 06/07/2022
Gravity: 10
Report ID: 0729300
Contest Date: 05/13/2022
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 05/17/2022 | $10,151.00 | 06/07/2022 | Serious | |
Penalty | C: Contested | 05/17/2022 | $10,151.00 | 06/07/2022 | Serious | |
Penalty | Z: Issued | 04/25/2022 | $10,151.00 | 06/07/2022 | Serious |
Text For Citation: 01 Item/Group: 015 Hazard:
29 CFR 1910.147(f)(4): Specific procedures were not utilized during shift or personnel changes to ensure the continuity of lockout or tagout protection, including provision for the orderly transfer of lockout or tagout device protection between off-going and oncoming employees, to minimize exposure to hazards from the unexpected energization or start-up of the machine or equipment, or the release of stored energy: Central Paper Stock, Inc. located at 6665 Jonas Place in Berkeley, MO 63134: The employer is failing to protect employees from caught-in and crushing hazards while performing maintenance, clearing jams or cleaning machines. This condition was most recently observed on or about 11/17/2021, when the employer failed to implement and utilize specific procedures during shift or personnel changes to ensure the continuity of lockout or tagout protection, including provision for the orderly transfer of lockout or tagout device protection between off-going and oncoming employees, to minimize exposure to hazards from the unexpected energization or start-up of the machine or equipment, or the release of stored energy. Employees failed to implement specific procedures during shift changes to ensure energy control procedures were complied while locking out machines to include, but not limited to, the following : a) The plastic "Badger" baler (Model: BADGER L-100S-2-10/7; Serial No: 8658) on the plastic side of the plant.