Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1185446.015
Citation: 01015
Citation Type: Serious
Abatement Date: 02/22/2017 2
Initial Penalty: $3,802.00
Current Penalty: $2,500.00
Issuance Date: 02/02/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0317900
Contest Date: 03/02/2017
Final Order: 03/12/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/12/2018 | $2,500.00 | 02/22/2017 | Serious | |
Penalty | C: Contested | 03/06/2017 | $3,802.00 | 02/22/2017 | Serious | |
Penalty | Z: Issued | 02/02/2017 | $3,802.00 | 02/22/2017 | Serious |
Text For Citation: 01 Item/Group: 015 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) SS Industries - On or about November 1, 2016, a flexible extension cord was used to power two fixed halogen light fixtures that were being used to illuminate the inside of the powder coat oven, exposing employees to shock and fire/electrical burns. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.