Violation Detail
Standard Cited: 19100303 G01 I C General.
Inspection Nr: 997958.015
Citation: 01014C
Citation Type: Other
Abatement Date: 07/06/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 02/17/2015
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0112000
Contest Date: 03/10/2015
Final Order: 06/06/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/06/2016 | $0.00 | 07/06/2016 | Other | |
Penalty | C: Contested | 03/12/2015 | $0.00 | 04/03/2015 | Serious | |
Penalty | Z: Issued | 02/17/2015 | $0.00 | 04/03/2015 | Serious |
Text For Citation: 01 Item/Group: 014C Hazard:
29 CFR 1910.303(g)(1)(i)(C): For electric equipment operating at 600 volts, nominal, or less to ground, and likely to require examination, adjustment, servicing, or maintenance while energized, the width of work space was not clear and did not extend from the grade, floor, or platform to the height required by paragraph (g)(1)(vi) of 29 CFR 1910.303. Other equipment associated with the electrical installation and located above or below the electric equipment extended more than 153 mm (6 inches) beyond the front of the electric equipment: A. Water Treatment Building/Demin: On, or about, October 9, 2014, transformer PTR-1B4 was located in the working space of panelboard PP-1B4. The transformer projected 12.5 inches from the face (vertical plane) of panelboard. B. Boiler House, MCC Room: On, or about, October 15, 2014, a Cutler-Hammer transformer was located in the working space for panel PP-UPS-1. The transformer projected 8 inches from the face (vertical plane) of the panelboard.