Violation Detail

Standard Cited: 19100303 B06 General.

Inspection Nr: 923022.015

Citation: 01014

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $4,900.00

Current Penalty: $4,200.00

Issuance Date: 01/09/2014

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 02/21/2014

Gravity: 10

Report ID: 0418400

Contest Date:

Final Order: 02/26/2014

Related Event Code (REC): C

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 02/26/2014 $4,200.00 02/21/2014 Serious  
Penalty Z: Issued 01/09/2014 $4,900.00 02/05/2014 Serious  

Text For Citation: 01 Item/Group: 014 Hazard:

29 CFR 1910.303(b)(6): 29 CFR 1910.303(b)(6): Equipment located in damp or wet locations and exposed to exterior weather elements was not identified for that purpose. (a) Dawson Grain Handling Facility, on or about and at times proceeding to July 23, 2013, 480 Volt pendant receptacle, which had deteriorated, was permanently installed on the exterior of the grain bin #1 & grain bin #6, exposing them to environmental conditions, resulting in an electrical hazard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.