Standard Cited: 19100119 M04 IV Process safety management of highly hazardous chemicals.
Inspection Nr: 311611081
Citation: 01014
Citation Type: Other
Abatement Status: X
Initial Penalty: $5,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 7
Nr Exposed: 13
Abatement Date: 03/08/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2018 | $0.00 | Other | ||
Penalty | Z: Issued | 03/08/2010 | $5,000.00 | Serious |
Text For Citation: 01 Item/Group: 014 Hazard: REFINERY
29 CFR 1910.119(m)(4)(iv): The report prepared at the conclusion of the investig ation of an incident which resulted in, or could have reseasonably have resulted in a catastrophic release of highly hazardous chemical in the workplace, did no t include the factors that contributed to the incident: a.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2003-IR-561854 which involved a flare line leak in the Alky 1 unit on or about July 7, 2003, did not include the factors that contributed t o the incident. b.BP-Husky Refining, LLC located in Oregon, Ohio: On or about No vember 16, 2009, the Incident Report 2006-IR-1810345 which involved a leak in th e East flare line near the Alky 2 unit on or about April 26, 2006, did not inclu de the factors that contributed to the incident. c.BP-Husky Refining, LLC locate d in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2009-IR-32 08733 which involved a leak on the main fare header in the Alky 1 unit on or abo ut August 30, 2009, did not include the factors that contributed to the incident . d.BP-Husky Refining, LLC located in Oregon, Ohio: On or about November 16, 2009, the Incident Report 2009-IR-3220578 which involved a flare line leak in the Alk y 1 unit on or about September 2, 2009, did not include the factors that contrib uted to the incident. e.BP-Husky Refining, LLC located in Oregon, Ohio: On or ab out November 16, 2009, the Incident Report 2009-IR-3237085 which involved the ac id degasser being routed to the flare and not the blowdown drum in the Alky 1 un it on or about September 21, 2009, did not include the factors that contributed to the incident. f.BP-Husky Refining, LLC located in Oregon, Ohio: On or about N ovember 16, 2009, the Incident Report 2009-IR-3144778 which involved a pinhole l eak in the FCC riser exterior wall in the FCC 1 unit on or about July 7, 2009, d id not include the factors that contributed to the incident. g.BP-Husky Refining, LLC located in Oregon, Ohio: O n or about November 16, 2009, the Incident Report 2009-IR-2906449 which involved a flange leak in the FCC Stripper bottoms in the FCC 2 unit on or about January 2, 2009, did not include the factors that contributed to the incident. In accor dance with 29 CFR 1903.19(d), abatement certification is required for this viola tion (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with you r certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of a batement, or other written records.t,