Violation Detail
Standard Cited: 19100430 C02 III Equipment.
Inspection Nr: 1519019.015
Citation: 01014
Citation Type: Serious
Abatement Date: 01/17/2023 2
Initial Penalty: $2,926.00
Current Penalty: $1,463.00
Issuance Date: 08/23/2021
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 1032300
Contest Date: 09/16/2021
Final Order: 01/17/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2023 | $1,463.00 | 01/17/2023 | Serious | |
Penalty | C: Contested | 11/23/2021 | $2,926.00 | 09/17/2021 | Serious | |
Penalty | Z: Issued | 08/23/2021 | $2,926.00 | 09/17/2021 | Serious |
Text For Citation: 01 Item/Group: 014 Hazard:
29 CFR 1910.430(c)(2)(iii): Breathing gas supply hose connectors were not resistant to accidental disengagement. A) The employer provided an air supply line that had a quick disconnect fitting on the end for surface supplied air dives in 70 feet of water.