Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1367898.015
Citation: 01014
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,630.00
Current Penalty: $4,215.00
Issuance Date: 06/18/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/10/2019
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 07/09/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/09/2019 | $4,215.00 | 07/10/2019 | Serious | |
Penalty | Z: Issued | 06/18/2019 | $6,630.00 | 07/10/2019 | Serious |
Text For Citation: 01 Item/Group: 014 Hazard:
29 CFR 1910.303(b)(2): Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling: a) On or about December 20, 2018, employees were exposed to electric shock, arc flash and burn hazards while connecting, testing and utilizing a 480 volt pump connected to a flexible cord that was connected to a Cutler-Hammer enclosed switch/disconnect. The disconnect was used as an on/off switch for the 480 volt pump and was placed unsecured on top of a fiber drum/barrel outside the salt to salt quench tank on line 2. The disconnect is designed to be mounted to a wall or fixed structure. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).