Violation Detail
Standard Cited: 19100305 B02 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1213761.015
Citation: 01014
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,975.00
Current Penalty: $3,585.00
Issuance Date: 08/23/2017
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 09/19/2017
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 09/14/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/14/2017 | $3,585.00 | 09/19/2017 | Serious | |
Penalty | Z: Issued | 08/23/2017 | $5,975.00 | 09/19/2017 | Serious |
Text For Citation: 01 Item/Group: 014 Hazard:
29 CFR 1910.305(b)(2)(i): Pull boxes, junction boxes, and fittings were not provided with covers approved for the purpose: Employees engaged in operating, inspecting, testing, and maintaining activities at the covered process equipment on the roof top of the West side of the Main Plant were exposed to electrical shock and fire hazards in that the company failed to ensure that the electrical box was equipped with a cover to prevent contact with the energized parts within: (a) Roof top by the Condenser High side Tower #6, the Evapco #6 E11538, the EC-6NE conduit which control the water pump was open. (b) Roof top by the North East Fan Tower #7, one side of the electrical control box was broken or missing. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violations is complete.