Violation Detail
Standard Cited: 19100184 E03 I Slings.
Inspection Nr: 999111.015
Citation: 01013C
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/06/2015
Nr Instances: 1
Nr Exposed: 70
Abatement Date: 04/13/2015
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 05/19/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/19/2015 | $0.00 | 04/13/2015 | Serious | |
Penalty | Z: Issued | 04/06/2015 | $0.00 | 04/13/2015 | Serious |
Text For Citation: 01 Item/Group: 013C Hazard:
29 CFR 1910.184(e)(3)(i): Thorough periodic inspections of alloy steel chain slings in use were not made on a regular basis: On or about October 8, 2014, and at times prior thereto, the employer did not ensure that alloy steel chain slings used throughout the facility were inspected on a regular basis for damage or defects, exposing employees to the hazard of being struck by falling loads in the event a sling should fail.