Violation Detail
Standard Cited: 19100219 E01 I Mechanical power-transmission apparatus.
Inspection Nr: 1655395.015
Citation: 01013B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/07/2023
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 09/19/2023
Gravity: 5
Report ID: 0317700
Contest Date: 09/29/2023
Final Order: 05/27/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/27/2024 | $0.00 | 09/19/2023 | Serious | |
Penalty | C: Contested | 10/25/2023 | $0.00 | 09/19/2023 | Serious | |
Penalty | Z: Issued | 09/07/2023 | $0.00 | 09/19/2023 | Serious |
Text For Citation: 01 Item/Group: 013B Hazard:
29 CFR 1910.219(e)(1)(i): Horizontal belts which had both runs seven feet or less from the floor level were not guarded with a guard that extended to at least fifteen inches above the belt or to a standard height: a) Production Area: A pair of unguarded belts on a fan motor for the small can paint booth ventilation system, located behind the paint booth control panel, exposed employees to caught in hazards, on or about March 22, 2023. b) Production Area: A pair of unguarded belts on a fan motor for the small can paint booth ventilation system, located near the main aisleway, exposed employees to caught in hazards, on or about March 22, 2023. ABATEMENT CERTIFICATION REQUIRED