Violation Detail
Standard Cited: 19260451 C01 II General requirements.
Inspection Nr: 1812740.015
Citation: 01013A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $14,895.00
Current Penalty: $14,895.00
Issuance Date: 07/24/2025
Nr Instances: 1
Nr Exposed: 18
Abatement Date: 08/19/2025
Gravity: 10
Report ID: 0317300
Contest Date:
Final Order: 08/19/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/19/2025 | $14,895.00 | 08/19/2025 | Other | |
Penalty | Z: Issued | 07/24/2025 | $14,895.00 | 08/19/2025 | Serious |
Text For Citation: 01 Item/Group: 013A Hazard:
29 CFR 1926.451(c)(1)(ii): Guys, ties, and/or braces were not installed according to the scaffold manufacturer's recommendations or at the closest horizontal member to the 4:1 height and repeated vertically at locations of horizontal members every 20 feet (56.1 m) or less thereafter for scaffolds 3 feet ((0.91 m) wide or less, and every 26 feet (7.9 m) or less thereafter for scaffolds greater than 3 feet (0.91m) wide. a) Old Lebanon Road, Welch Combined Elementary/Middle School, Dover AFB, DE 19902; on or about March 21, 2025, employees were exposed to caught in/struck by hazards as well as fall hazards when the scaffold being used was not tied, guyed, or braced when required to do so.