Violation Detail
Standard Cited: 19100184 F01 Slings.
Inspection Nr: 1738003.015
Citation: 01013A
Citation Type: Serious
Abatement Date: 10/22/2024 2
Initial Penalty: $12,421.00
Current Penalty: $8,075.00
Issuance Date: 09/25/2024
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 10/18/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/18/2024 | $8,075.00 | 10/22/2024 | Serious | |
Penalty | Z: Issued | 09/25/2024 | $12,421.00 | 10/22/2024 | Serious |
Text For Citation: 01 Item/Group: 013A Hazard:
29 CFR 1910.184(f)(1): Wire-rope slings did not have permanently affixed and legible identification markings as prescribed by the manufacturer that indicated the recommended safe working load for the type(s) of hitch(es) used, the angle upon which it is based, and the number of legs if more than one. On or about April 3, 2024, at the Furnace; employees were using a wire rope sling that did not have the safe working load affixed while they were loading, moving, guiding, and lowering copper into the copper melting process with the use of an overhead crane.