Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1207843.015
Citation: 01013A
Citation Type: Serious
Abatement Date: 04/03/2018 3
Initial Penalty: $5,070.00
Current Penalty: $2,433.00
Issuance Date: 06/26/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 07/09/2017
Final Order: 02/02/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/02/2018 | $2,433.00 | 04/03/2018 | Serious | |
Penalty | C: Contested | 07/26/2017 | $5,070.00 | Serious | ||
Penalty | Z: Issued | 06/26/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 013A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: a) On or about 2/16/2017, Boiler building: A marked exit door from the electrical room was tied shut, preventing it from being opened.