Violation Detail
Standard Cited: 19100303 B01 II General.
Inspection Nr: 1077467.015
Citation: 01013A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,930.00
Current Penalty: $6,930.00
Issuance Date: 12/24/2015
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 02/12/2016
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order: 01/21/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/21/2016 | $6,930.00 | 02/12/2016 | Serious | |
Penalty | Z: Issued | 12/24/2015 | $6,930.00 | 02/12/2016 | Serious |
Text For Citation: 01 Item/Group: 013A Hazard:
29 CFR 1910.303(b)(1)(ii): Electrical equipment was not free from recognized hazards, based on the mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided: a/ At the Kieserling Line, adjacent to the Collecting Bucket, the conduit supplying 240 volt electrical power to the Crouse Hinds Heavy-Duty Safety Switch, m/n 4, s/n HV362, had physically separated exposing the internal wiring. b/ At the Kieserling Line, the conduit supplying electrical power to a component of this machine had physically separated exposing the internal wiring.