Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 314505298
Citation: 01013
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 11/09/2010
Nr Instances: 1
Nr Exposed: 23
Abatement Date: 12/03/2010
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Text For Citation: 01 Item/Group: 013 Hazard: CHEMNEP
29 CFR 1910.119(j)(2): The employer did not establish and implement written procedures to maintain the on-going mechanical integrity of process equipment: A written mechanical integrity program was not developed and implemented for the aerosol can filling line prior to the beginning of the operation. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).n
Translate