Violation Detail
Standard Cited: 19100119 J05 Process safety management of highly hazardous chemicals.
Inspection Nr: 313017774
Citation: 01013
Citation Type: Other
Abatement Date: 08/05/2011 X
Initial Penalty: $7,000.00
Current Penalty:
Issuance Date: 06/21/2011
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity: 10
Report ID: 0524530
Contest Date: 07/13/2011
Final Order: 09/10/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/10/2012 | 08/05/2011 | Other | ||
Penalty | Z: Issued | 06/21/2011 | $7,000.00 | 08/05/2011 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard: CHEMNEP
29 CFR 1910.119(j)(5): Deficiencies were not corrected in equipment that were outside acceptable limits before further usage: (a)Throughout the Tank Farm unit, including - but not limited to, 4" dump lines PFF- 421, PFF-422, and PFF-423, the poor condition of external paint/coating was not addressed. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).