Violation Detail
Standard Cited: 19100147 D03 The control of hazardous energy (lockout/tagout).
Inspection Nr: 312945488
Citation: 01013
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,500.00
Current Penalty: $555.00
Issuance Date: 08/20/2009
Nr Instances: 2
Nr Exposed: 15
Abatement Date: 08/31/2009
Gravity: 10
Report ID: 0522000
Contest Date: 08/26/2009
Final Order: 08/12/2010
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/12/2010 | $555.00 | 08/31/2009 | Serious | |
| Penalty | Z: Issued | 08/20/2009 | $4,500.00 | 08/31/2009 | Serious |
Translate