Standard Cited: 19100179 H03 Overhead and gantry cranes.
This violation item has been deleted.
Inspection Nr: 191122.015
Citation: 01013
Citation Type: Serious
Abatement Date: 08/17/2012
Initial Penalty: $7,000.00
Current Penalty: $0.00
Issuance Date: 07/27/2012
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 10
Report ID: 0524200
Contest Date: 08/16/2012
Final Order: 01/10/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/10/2014 | $0.00 | 08/17/2012 | Serious | |
Penalty | C: Contested | 08/17/2012 | $7,000.00 | 08/17/2012 | Serious | |
Penalty | Z: Issued | 07/27/2012 | $7,000.00 | 08/17/2012 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.179(h)(3): Crane loads that were supported by more than one part of rope, were not provided with equal tension for all of the parts. a) Machine Shop 2 Annex- The employer failed to ensure that on cranes, where the load was supported by more than one part of rope, that equal tension was placed on all parts of the crane, on cranes such as Crane #T2313. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.