Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1503876.015
Citation: 01013
Citation Type: Serious
Abatement Date: 07/08/2021 2
Initial Penalty: $5,266.00
Current Penalty: $3,159.60
Issuance Date: 05/20/2021
Nr Instances: 2
Nr Exposed: 50
Related Event Code (REC):
Gravity: 1
Report ID: 0418400
Contest Date:
Final Order: 06/14/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/14/2021 | $3,159.60 | 07/08/2021 | Serious | |
Penalty | Z: Issued | 05/20/2021 | $5,266.00 | 07/08/2021 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) At building 308, in the production area, on or about November 24, 2020, the employer used multiple extension cords, routed throughout the ceiling support beams, as a permanent power supply to electrically powered equipment, thereby exposing employees to fire hazards.