Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1326471.015
Citation: 01013
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,712.00
Current Penalty: $3,100.00
Issuance Date: 12/17/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 03/14/2019
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 03/07/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/07/2019 | $3,100.00 | 03/14/2019 | Serious | |
| Penalty | Z: Issued | 12/17/2018 | $4,712.00 | 01/14/2019 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Production area - On or about June 27, 2018 and at times prior to, employees used an extension cord to provide power to equipment including but not limited to cell phones and fans. The ground pin was broken off the attachment plug, exposing employees to injuries from electrical shock.