Violation Detail
Standard Cited: 19100219 F03 Mechanical power-transmission apparatus.
Inspection Nr: 1187531.015
Citation: 01013
Citation Type: Serious
Abatement Date: 04/27/2017 2
Initial Penalty: $12,675.00
Current Penalty: $12,675.00
Issuance Date: 04/12/2017
Nr Instances: 7
Nr Exposed: 16
Related Event Code (REC): R
Gravity: 10
Report ID: 0625400
Contest Date: 04/26/2017
Final Order: 07/17/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/17/2018 | $12,675.00 | 04/27/2017 | Serious | |
Penalty | C: Contested | 05/02/2017 | $12,675.00 | 04/27/2017 | Serious | |
Penalty | Z: Issued | 04/12/2017 | $12,675.00 | 04/27/2017 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.219(f)(3): Sprocket wheels and chains which were seven 7 feet or less above floors or platforms were not enclosed: On or about October 25, 2016, in the casting department, employees work in and around the unguarded chains and sprockets when pouring the resin mix and replacing the paper at the gel molds. Employees exposed to the hazard of being caught-in the rotating chain and sprockets.