Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1185446.015
Citation: 01013
Citation Type: Serious
Abatement Date: 02/22/2017 2
Initial Penalty: $3,802.00
Current Penalty: $2,500.00
Issuance Date: 02/02/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0317900
Contest Date: 03/02/2017
Final Order: 03/12/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/12/2018 | $2,500.00 | 02/22/2017 | Serious | |
Penalty | C: Contested | 03/06/2017 | $3,802.00 | 02/22/2017 | Serious | |
Penalty | Z: Issued | 02/02/2017 | $3,802.00 | 02/22/2017 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: 1) SS Industries - Weld Booth #1 - On or about November 1, 2016, two relocatable power taps were connected in series by an extension cord to power multiple industrial tools, such as but not limited to, a 36 inch floor fan, handheld grinder(s), and a 5 foot long overhead fluorescent light ballast, which were not used in accordance with the UL listing or labeling, exposing workers to shock and electrical burns. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.