Violation Detail
Standard Cited: 19260451 E06 VI General requirements.
Inspection Nr: 1118434.015
Citation: 01013
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,905.00
Issuance Date: 06/03/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/13/2016
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 07/01/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2016 | $1,905.00 | 06/13/2016 | Serious | |
| Penalty | Z: Issued | 06/03/2016 | $2,800.00 | 06/13/2016 | Serious |
Text For Citation: 01 Item/Group: 013 Hazard:
29 CFR 1926.451(e)(6)(vi): Integral prefabricated scaffold access frames being used for access had a spacing greater than 16 3/4 inches. a- 642 Bedford Avenue, Brooklyn NY: On or about 1/14/16, a site worker was climbing the different levels of the scaffold using the frames and cross braces. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.