Violation Detail
Standard Cited: 19100119 J04 IV Process safety management of highly hazardous chemicals.
Inspection Nr: 312487457
Citation: 01012B
Citation Type: Serious
Abatement Status: W
Initial Penalty:
Current Penalty:
Issuance Date: 07/08/2009
Nr Instances: 1
Nr Exposed: 17
Abatement Date: 08/10/2009
Gravity: 10
Report ID: 0317000
Contest Date: 07/28/2009
Final Order: 01/17/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2012 | 08/10/2009 | Serious | ||
Penalty | Z: Issued | 07/08/2009 | 08/10/2009 | Serious |
Text For Citation: 01 Item/Group: 012B Hazard: REFINERY
29 CFR 1910.119(j)(4)(iv): The documentation of the inspection or test that been performed on process equipment to maintain its mechanical integrity did not identify the date of the inspection or test, the serial number or other identifier of the equipment on which the inspection or test was performed, a description of the inspection or test, and the results of the inspection or test: a) Sunoco Marcus Hook Refinery, 10 Plant FCCU - The employer's documentation of inspections conducted of the 10 Plant Fraid Stack did not include the date of the test, the name of the inspector, and a description of the inspection of test, for inspection conducted in 1996 and 2000. Violation noted on or about 4/15/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED