Violation Detail
Standard Cited: 6A0001 General Duty Clause
Inspection Nr: 311211296
Citation: 01012B
Citation Type: Serious
Abatement Status: E
Initial Penalty:
Current Penalty:
Issuance Date: 05/03/2010
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 06/04/2010
Gravity: 10
Report ID: 0257260
Contest Date: 05/21/2010
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 04/26/2012 | 06/04/2010 | Serious | ||
| Penalty | Z: Issued | 05/03/2010 | 06/04/2010 | Serious |
Text For Citation: 01 Item/Group: 012B Hazard: HEAT
Section 6(a) of the Puerto Rico Occupational Safety and Health Act: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or physical harm to employees in that employees were exposed to: Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico: El patrono no proveyo empleo y un sitio de empleo libre de riesgos reconocidos que esten causando o que puedan causar muerte o dano fisico a los empleados, por cuanto empleados estaban expuestos a: API - 570 - NOV 2009 is a recognized Industry standard of recommended practices covers inspection, rating, repair, and alteration procedures for metallic and fiberglass reinforced plastic (FRP) piping systems and their associated pressure relieving devices that have been placed in-service. a)Employees that worked at Caribbean Petroleum Refining in Bayamon performing routine task such as tank operator, waste treatment operator, loading rack operator, among others were or could be exposed to flammable and combustible releases, fire and or explosion. Since 2000 the refinery process area was out of service, but the facility continued with the storage and distribution of gasoline, diesel, fuel oil, and jet fuel. At the Tank Farm Area there was approximately 45 above ground steel tanks ranging in capacity from 500 to 500,000 barrels. The products were transfered to and from the tanks via above and underground pipelines. The employer did not maintain all the required records of piping inspections. Among other methods, one feasible and acceptable abatement method to correct this hazard is: 1.Follow API 570 - 7.6.2 Types of Piping Records. Piping system and pressure-relieving device records shall contain four types of information pertinent to mechanical integrity as follows. a.Fabrication, Construction and Design Information to the Extent Available - For example, MDRs, MTRs, weld maps, WPS/PQR, design specification data, piping design calculations, NDE records, heat treat records, pressure-relieving sizing calculations and construction drawings. b.Inspection History - For example, inspection reports, and data for each type of inspection conducted (e.g. internal, external, thickness measurements), and inspection recommendations for repair. Inspection reports shall document the date of each inspection and/or examination, the date of the next scheduled inspection, the name (or initials) of the person who performed the inspection and/or examination, the serial number or otheridentifier of the equipment inspected, a description of the inspection and/or examination performed, and the results of the inspection and/or examination. Piping RBI records should be in accordance with API 580. c.Repair, Alteration, and Re-rating Information - For example: 1.repair and alteration forms if prepared 2.reports indicating that piping systems still in-service with either identified deficiencies, temporary repairs or recommendations for repair, are suitable for continued service until repairs can be completed; and 3.rerating documentation (including rerating calculations and new design conditions d.Fitness-For-Service Assesment Documentation Requirements are Described in API 579-1/ASME FFS-1. API - 570 - NOV 2009 es un reglamento de practicas reconocidas por la industria que abarca procedimientos de inspeccion, clasificacio, reparacion y alteracion para sistemas de tuberias metalicas y de plastico reforzado con fibra de vidrio y sus dispositivos de liberacion de presion conectados que hayan sido puesto en servicio. a)Empleados que trabajaban en Caribbean Petroleum Refining en Bayamon, realizando tareas rutinarias tales como operador de tanque, operador de tratamiento de aguas, operador de area de carga, entre otros, fueron o podrian estar expuestos a liberacion de productos quimicos inflamables y combustibles, fuego y/o explosion. Desde el ano 2000 el area de procesos de la refineria habia estado fuera de servicio pero la compania continuo con el almacenamiento y distribucion de gasolina, diesel, aceite combustible y combustible para aviones. En la granja de tanques habian alrededor de 45 tanques de acero sobre el terreno, con capacidades que fluctuaban entre 500 a 500,000 barriles. Los productos fueron transferidos desde y hacia los tanques, a traves de tuberias que estaban por encima y debajo del terreno. El patrono no mantuvo todos los registros requeridos de las inspecciones a las tuberias. Un metodo seguro entre otros metodos aceptables para corregir este riesgos es: 1.Seguir el API 570 - 7.6.2 Registros de Tipos de Tuberias. Registros de sistemas de tuberias y equipos de liberacion de presion deben contener cuatro tipos de informacion pertinentes a integridad mecanica como sigue: a.Fabricacion, Construccion e Informacion de Diseno al alcance disponible - Por ejemplo, MDRs, MTRs, planos de soldadura, WPS/PQR, datos de la especificacion de diseno, computos deldiseno de la tuberia, registros NDE, registros de tratamientos con calor, computos de las dimensiones de liberacion de presion y dibujos de construccion. b.Historial de Inspeccion - Por ejemplo, reportes de inspecciones y los datos para cada tipo de inspeccion conducida (ej. medidas de grosor internas, externas), y las recomendaciones para reparaciones.Los reportes de inspecciones deben documentar la fecha de cada inspeccion y/o examen, la fecha de la proxima inspeccion en calendario, el nombre (o iniciales) de la persona que realizo la inspeccion y/o examen, el numero de serie u otro identificador del equipo inspeccionado, una descripcion de la inspeccion y/o examen llevado a cabo y los resultados de la inspeccion y/o examen. Los RBI de las tuberias deben ser de acuerdo con el API 580. c.Informacion de Reparaciones, Alteraciones y Reclasificaciones - Por ejemplo: 1.formas de reparacion y alteracion si fueron preparadas 2.reportes que indiquen que sistemas tuberias aun en servicio con ya sea deficiencias identificadas, reparaciones temporeras o con recomendaciones para reparaciones estan calificadas para uso continuo hasta que las reparaciones puedan ser completadas; y 3.documentacion de reclasificacion (incluyendo calculos de reclasificacion y condiciones del nuevo diseno d.Requisitos de la Documentacion para la evaluacion de la Condicion para Servicio como descrito en API 579-1/ASME FFS-1.ASME