Violation Detail
Standard Cited: 19100305 A02 XI Wiring methods, components, and equipment for general use.
Inspection Nr: 314623711
Citation: 01012A
Citation Type: Other
Abatement Date: 12/14/2010 I
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 12/09/2010
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0729300
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/04/2011 | $7,000.00 | 12/14/2010 | Other | |
Penalty | Z: Issued | 12/09/2010 | $7,000.00 | 12/14/2010 | Serious |
Text For Citation: 01 Item/Group: 012A Hazard: CHEMNEP
29 CFR 1910.305(a)(2)(xi): Cable assemblies, flexible cords, and cables were not supported in place at intervals that ensured they were not exposed to physical damage: Walkway Between Boiler House and Fixed Fuel Tank: A flexible cord set (extension cord) was run on the ground between the boiler room across a walkway to power a fixed fuel tank.