Standard Cited: 19100269 D03 II Electric Power Generation, Transmission, and Distribution.

Inspection Nr: 900009.015

Citation: 01012

Citation Type: Other

Abatement Status: Abatement Completed

Initial Penalty: $7,000.00

Current Penalty: $0.00

Issuance Date: 09/24/2013

Nr Instances: 1

Nr Exposed: 9

Abatement Date: 11/06/2013

Gravity:

Report ID: 0418200

Contest Date: 11/04/2013

Final Order: 12/05/2014

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 12/05/2014 $0.00 11/06/2013 Other  
Penalty C: Contested 12/30/2013 $7,000.00 11/06/2013 Serious  
Penalty Z: Issued 09/24/2013 $7,000.00 11/06/2013 Serious  

Text For Citation: 01 Item/Group: 012 Hazard:

29 CFR 1910.269(d)(3)(ii): Lockout devices and tagout devices shall be singularly identified; shall be the only devices used for controlling energy; may not be used for other purposes; and shall meet the following requirements: a. Georgia Power will develop a standard (GPC Generator) tagging process for equipment not under a clearance. Georgia Power will also add language to its 0200 General Clearance Procedure for the removal of equipment under a clearance that is being removed from service.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.