Violation Detail
Standard Cited: 0650003001 Asbestos Project Protection Method Rules
Inspection Nr: 314716804
Citation: 01012
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,800.00
Current Penalty: $1,259.09
Issuance Date: 03/10/2011
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 01/27/2011
Gravity:
Report ID: 1055340
Contest Date: 03/25/2011
Final Order: 03/02/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/02/2012 | $1,259.09 | 01/27/2011 | Serious | |
| Penalty | Z: Issued | 03/10/2011 | $1,800.00 | 01/27/2011 | Serious |
Translate