Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1502375.015
Citation: 01012
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,510.00
Current Penalty: $5,757.00
Issuance Date: 05/10/2021
Nr Instances: 3
Nr Exposed: 1
Abatement Date: 06/04/2021
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 06/08/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/08/2021 | $5,757.00 | 06/04/2021 | Serious | |
Penalty | Z: Issued | 05/10/2021 | $7,510.00 | 06/04/2021 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.303(f)(2):Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: a) Clean Room: On November 12, 2020, and at times prior, the employer exposed employees to electrical shock hazards in that the employer did not ensure that the circuits of the Square D electrical panels "3500" and "3700" were marked to indicate the purposes of each switch. b) Wastewater Treatment Building: On November 12, 2020, and at times prior, the employer exposed employees to electrical shock hazards in that the employer did not ensure that the circuits of the electrical panel near the entrance were marked to indicate the purposes of each switch. c) Control Room, Main Office: On November 12, 2020, and at times prior, the employer exposed employees to electrical shock hazards in that the employer did not ensure that the circuits of the Square D electrical panel were marked to indicate the purposes of each switch.