Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1365456.015
Citation: 01012
Citation Type: Serious
Abatement Date: 05/30/2019
Initial Penalty: $6,630.00
Current Penalty: $0.00
Issuance Date: 05/03/2019
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC):
Gravity: 5
Report ID: 0524200
Contest Date: 05/08/2019
Final Order: 08/28/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/28/2020 | $0.00 | 05/30/2019 | Serious | |
Penalty | C: Contested | 08/13/2019 | $6,630.00 | 05/30/2019 | Serious | |
Penalty | Z: Issued | 05/03/2019 | $6,630.00 | 05/30/2019 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a) Spot Welding Area- On April 23, 2019, the employer failed to provide permanent wiring for the Spot Welding Machines. Flexible cords were run to each of these fixed pieces of equipment. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.