Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1345312.015
Citation: 01012
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,956.00
Current Penalty: $1,478.00
Issuance Date: 11/29/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/28/2019
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 12/26/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/26/2018 | $1,478.00 | 02/28/2019 | Serious | |
Penalty | Z: Issued | 11/29/2018 | $2,956.00 | 12/19/2018 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: On or about September 10, 2018, the employer did not ensure one or more methods of machine guarding was provided to protect machine operators from the hazards created by the rotating arm of the Fanuc System R-30IA Mate Robotic Cell. Employees operate device by a two hand control. However, there is no interlock or light curtains at the entrance of the Fanuc System R-30IA Mate Robotic Cell. The employees are entering the Fanuc System R-30IA Mate Robotic Cell while its in operation to adjust the paint flow.