Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 1299619.015
Citation: 01012
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,956.00
Current Penalty: $2,956.00
Issuance Date: 08/24/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/18/2018
Gravity: 5
Report ID: 0626000
Contest Date:
Final Order: 09/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/24/2018 | $2,956.00 | 09/18/2018 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.303(b)(7)(iv): Electric equipment had damaged parts that may adversely affect safe operation or mechanical strength of the equipment, such as parts that are broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating. On February 28, 2018, and times prior thereto, in the production area, the power switch on a drill press was secured with duct tape to avoid de-energization of the press.