Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1196140.015
Citation: 01012
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,054.00
Current Penalty: $5,612.10
Issuance Date: 06/07/2017
Nr Instances: 2
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 06/30/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/30/2017 | $5,612.10 | Serious | ||
Penalty | Z: Issued | 06/07/2017 | $9,054.00 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: On or about 2/10/2017 throughout the plant employees were exposed to electrical shock and burn hazards where electrical floor fans had electrically charged outer metallic casings: a. Maxx Air Pro, 42" Red floor fan in use at the painting/grinding area, was receiving power from a yellow flexible cord that was missing the ground pin, b. Maxx Air Pro, 42" Orange floor fan at door 9, received power from a yellow flexible cord that was missing the ground pin.