Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1118434.015
Citation: 01012
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,905.00
Issuance Date: 06/03/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/13/2016
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 07/01/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/01/2016 | $1,905.00 | 06/13/2016 | Serious | |
| Penalty | Z: Issued | 06/03/2016 | $2,800.00 | 06/13/2016 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a- 642 Bedford Avenue, Brooklyn NY: On or about 1/14/16, a site worker was observed working from different levels of a prefabricated, tubular, welded framed scaffold whose walking/working levels were not fully planked. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.