Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1018385.015
Citation: 01012
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,600.00
Current Penalty: $1,800.00
Issuance Date: 07/13/2015
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0524200
Contest Date:
Final Order: 07/21/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/21/2015 | $1,800.00 | Serious | ||
Penalty | Z: Issued | 07/13/2015 | $3,600.00 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Secondary Operations Area- The employer failed to ensure that electrical equipment, such as the multiple outlet relocatable power tap attached to and powering Air Press #1, was being used only to power audiovisual equipment as permitted under its listing and labeling. The multiple outlet relocatable power taps was used to power the Air Press and its auxiliary equipment. No abatement certification or documentation is required for this item.